Who we serve

Studios & Showrooms

Operating context

The coordination layer between order and installation

Studios and showroom networks run the same sequence on every project: design and selection, specification, order, production, jobsite coordination, freight, delivery, installation and handover.

With European product, most of that sequence sits with production offices in Italy and across Europe, working their own day in their own language while the jobsite runs on US time. Every exchange costs a day.

Most practices do have someone holding this together. In a studio, procurement falls to the principal, or to a project manager already running several projects, between design reviews and client meetings. In a showroom the back office handles the order with the factory, while the jobsite is absorbed by the senior person in the store, usually a location manager carrying a sales number alongside it. At low volume the arrangement holds. As concurrent projects increase, that person becomes the bottleneck: coordination between order and installation is a full-time role that nobody formally holds.

Three client profiles

Design-build studiosA roster of concurrent projects coordinated by the principal between client meetings, with purchasing and site follow-up running at the studio’s most expensive hourly rate.
Architecture studiosDesign authority held in-house, with procurement, lead times and deliveries consuming hours that belong to design development.
Showroom & dealer networksJobsite control per location, where the back office handles the factory and the senior salesperson absorbs the jobsite alongside a sales number.

Corepoint Portfolio-Level Services

Two services across a portfolio, engaged separately and per location. Showrooms keep their back end and get help on the jobsite. Studios get the procurement back end they don’t have.

Portfolio level · Project control

Project Operations

Jobsite control from order to handover for a showroom or dealer network, engaged per location.Project management on the jobsite side for showrooms and dealer networks, engaged per location, from order to closed-out handover, with weekly and monthly reporting.

In most showroom networks the back office runs the factory order, and the jobsite falls to the senior person in the store, usually a manager with a sales number. It holds at low volume. As the number of concurrent projects rises, specification drifts between what was sold and what ships, sequencing turns into daily firefighting, and handover has no defined path back to the production office.

Corepoint runs the jobsite per location: orders checked against design and site, a readiness gate before delivery, the trades coordinated, closeout through handover. On site at each milestone, a local operator in between.

Design, the client and the factory order stay with the showroom.

For  High-end interior showrooms · Dealer networks

Engagement & Deliverables

Every location is scoped individually, and the deliverable set is defined after the discovery call.

Portfolio level · Procurement

Studio Portfolio Coordination

The procurement back end for every project in a studio: purchasing, lead times, deliveries and cash timing.The procurement back end for every project in a studio: purchasing, lead times, deliveries and cash timing, with weekly and monthly dashboard reporting of the whole roster.

Studios don’t lose money one project at a time. They lose it in the gaps between projects — orders tracked in inboxes, install conflicts found late, deposits due before client money lands, no single place where the whole book of work is visible. This service is that place: one status board, one procurement tracker, one cash-timing view across the roster, run on a monthly rhythm.

Engaged per location, covering every active project there. The retainer is fixed and independent of purchase volume. Corepoint holds no payment or account access and makes no final vendor selection.

Design, clients and the GC stay with the studio.

For  Design-build studios · Architecture studios

Engagement & Deliverables

Every location is scoped individually, and the deliverable set is defined after the discovery call.

Authority

What Corepoint provides

Every engagement carries a written responsibility matrix. Corepoint runs the coordination process, while design, financial responsibility and site work stay with the parties appointed to them.

Project Operations

ActivityCorepointShowroomVendor / logisticsGC / installer
Design & specificationNot involvedOwnsNot involvedNot involved
Client relationship & sellingNot involvedOwnsNot involvedNot involved
Order confirmation & PO controlContributesOwnsContributesNot involved
Production tracking & escalationContributesOwnsContributesNot involved
Freight, customs & deliveryContributesContributesOwnsNot involved
Site readiness & field verificationOwnsContributesNot involvedContributes
InstallationCoordinatesNot involvedNot involvedOwns
Reporting, punch & closeoutOwnsContributesNot involvedContributes

Studio Portfolio Coordination

ActivityCorepointStudioVendorGC / trades
Design & client relationshipNot involvedOwnsNot involvedNot involved
Vendor selection & budget approvalContributesOwnsNot involvedNot involved
Order placement & follow-upOwnsContributesContributesNot involved
Lead-time & delivery trackingOwnsContributesContributesNot involved
Installer & receiver coordinationOwnsContributesContributesContributes
GC coordinationContributesOwnsNot involvedContributes
Site works & installationContributesNot involvedNot involvedOwns
Portfolio reporting & closeoutOwnsContributesNot involvedContributes

Explore services for
Developers & Private Owners